Share: Share on Facebook Share on Twitter Share on LinkedIn I recommend visiting cushmanwakefield.com to read:%0A%0A {0} %0A%0A {1}
dccg2025-desktop.jpg dccg2025-mobile.jpg

Asia Pacific Data Centre Construction Cost Guide 2026

Pritesh Swamy • 3/31/2026

Our 2026 report provides a comprehensive analysis of both land purchase and data centre construction costs to assist data centre operators, developers, investors and lenders looking to better understand the sector’s capital requirements.

Drawing on Cushman & Wakefield data from 90 clusters across 26 data centre locations, the report provides detailed modelling and cost scenarios along with insights into key themes influencing the sector’s development: power availability and cost, AI, and investment trends.

In this 2026 edition of the Data Centre Construction Cost Guide, we examine data centre development costs across key Asia Pacific markets and explore the major themes influencing cost escalation and development strategies. From evolving technical specifications and sustainability considerations to supply chain constraints and market driven design shifts, this guide provides insight into the forces shaping the next generation of data centre investment across the region.

Data Centre Construction Costs

Construction costs across Asia Pacific continued to rise in 2025, increasing by an average of 10% year‑on‑year as demand intensified and supply chains remained under pressure. The five most expensive construction markets have remained consistent with continued supply chain shortages and regulatory mandates to achieve high performance and sustainability requirements. Demand in the top markets is also fueled by cloud providers aggressively chasing additional power.

 

Most Expensive Markets

(ranked by mid-range cost and based on a mid-specification build)

  1. Japan External Link
  2. Singapore External
  3. South Korea External Link
  4. Australia External
  5. Hong Kong, China External Link
$name

related insights / news

APAC DCIR - Homepage banner-Landing-page-banner.jpg
Research • Technology

Asia Pacific Data Centre Investment Landscape

Discover the Asia Pacific data centre investment landscape. This report covers 14 markets, exploring key fundamentals like population, CapEx, and yield-on-cost.
Pritesh Swamy • 8/23/2026
research-hero.jpg
Research

APAC Data Centre Update: H1 2026

This report covers 9 primary and 6 secondary markets. It also features the Asia Pacific Data Centre Markets Maturity Index, which tracks 30 markets.
Andrew Green • 7/30/2026
APC Data Centre Construction per Capita_News Card Image.jpg
Malaysia, Thailand, Japan set pace on Asia Pacific data centre construction per capita through end of decade

Malaysia’s strong data centre development pipeline will see its population per megawatt ratio consolidate faster than any other Asia Pacific market between now and the end of the decade, with Thailand and Japan seeing the second and third fastest rates of consolidation, according to a new report from global real estate services firm Cushman & Wakefield.

Amy Kelly • 6/12/2025

CAN'T FIND WHAT YOU'RE LOOKING FOR?

Get in touch with one of our professionals.

With your permission we and our partners would like to use cookies in order to access and record information and process personal data, such as unique identifiers and standard information sent by a device to ensure our website performs as expected, to develop and improve our products, and for advertising and insight purposes.

Alternatively click on More Options and select your preferences before providing or refusing consent. Some processing of your personal data may not require your consent, but you have a right to object to such processing.

You can change your preferences at any time by returning to this site or clicking on Privacy & Cookies.
MORE OPTIONS
AGREE AND CLOSE
These cookies ensure that our website performs as expected,for example website traffic load is balanced across our servers to prevent our website from crashing during particularly high usage.
These cookies allow our website to remember choices you make (such as your user name, language or the region you are in) and provide enhanced features. These cookies do not gather any information about you that could be used for advertising or remember where you have been on the internet.
These cookies allow us to work with our marketing partners to understand which ads or links you have clicked on before arriving on our website or to help us make our advertising more relevant to you.
Agree All
Reject All
SAVE SETTINGS